Building the base parts 5 and 10

Viewing 3 posts - 1 through 3 (of 3 total)
  • Author
    Posts
  • #19287

    I just finished the rectangle that is the outer base, and secured Item 10 to 1. Where am I supposed to fasten the screws for part 5? I can see securing screws from 1 to 5. But what about the two 5’s that’s secure to part 2? Am I supposed to screw them together first? How do they fasten to 10? Any pointers would be greatly appreciated thanks!

    #20708

    Nevermind everyone…not that anyone answered. I just ended up using L brackets to secure those pieces. Hopes this helps someone in the future.

    #20713

    See the image below for typical fastener locations – precision is not required, but be sure you offset the second layer fasteners.
    You may use 2 1/2″ long drywall screws or nails. If nailing, a power nailer will speed construction.
    For tough permanent construction include the use of PL-200 type construction adhesive. Requires caulk gun.

    typical_fastener_locations.jpg

Viewing 3 posts - 1 through 3 (of 3 total)
  • You must be logged in to reply to this topic.
Easy Home Bar Plans